|
| Title: |
IC 3101 and GTW 5854 |
| Description: |
After the ballast train, BNSF slowed down, but CP was finally coming to life as a northbound CP 541 was approaching from the south. CN L586 was also waiting for permission across the river. IC and GTW repaints are in charge of the local for this visit. |
| Photo Date: |
6/1/2024 Upload Date: 8/18/2024 6:41:15 PM |
| Location: |
Dubuque, IA |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3101(GP40R) GTW 5854(GP38-2) |
| Views: |
325 Comments: 0 |
|
|
|
| Title: |
IC 3101 and KCS 4113 |
| Description: |
CP 541 rolls into town with my first KCS leader of the day passing CN L586. It was raining so hard at this point it was almost impossible to keep rain drops out of the lens. |
| Photo Date: |
6/1/2024 Upload Date: 8/18/2024 6:42:49 PM |
| Location: |
Dubuque, IA |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
KCS 4113(SD70ACe) IC 3101(GP40R) |
| Views: |
350 Comments: 0 |
|
|
|
| Title: |
IC 3101 |
| Description: |
With permission from the bridge tender and BNSF to come across the river, I raced over to the other side and grabbed CN L586 popping out of the East Dubuque tunnel. |
| Photo Date: |
6/1/2024 Upload Date: 8/18/2024 6:46:55 PM |
| Location: |
East Dubuque, IL |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3101(GP40R) |
| Views: |
338 Comments: 0 |
|
|
|
| Title: |
IC 3101 |
| Description: |
After the Z train, the bridge tender and BNSF La Crosse gave permission to CN L586 to come across the river and do their work at Bishop. Even though I had shot the IC 3101 coming through the tunnel yesterday, Dad had not, so thats where we shot the local. I went with something a little different though, grabbing a wider angle shot of the train already out of the tunnel. |
| Photo Date: |
6/2/2024 Upload Date: 8/20/2024 4:58:28 PM |
| Location: |
East Dubuque, IL |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3101(GP40R) |
| Views: |
330 Comments: 0 |
|
|
|
| Title: |
IC 3108 |
| Description: |
An IC Deathstar painted geep leads a pulldown job through Kirk Yard with a BLE Tunnelmotor |
| Photo Date: |
6/26/2018 Upload Date: 9/15/2018 2:43:29 PM |
| Location: |
Gary, IN |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3108(GP40R) |
| Views: |
513 Comments: 0 |
|
|
|
| Title: |
IC 3108 and BLE 910 |
| Description: |
The IC and BLE units on the pulldown push the train back down into the yard. |
| Photo Date: |
6/26/2018 Upload Date: 9/15/2018 3:32:27 PM |
| Location: |
Gary, IN |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3108(GP40R) BLE 910(SD40-3) |
| Views: |
611 Comments: 0 |
|
|
|
| Title: |
IC 3108 |
| Description: |
IC 3108 was the other GP40R. The EOT rests on the side of the engine. |
| Photo Date: |
1/28/2021 Upload Date: 8/14/2021 5:19:13 PM |
| Location: |
Kankakee, IL |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3108(GP40R) |
| Views: |
95 Comments: 0 |
|
|
|
| Title: |
IC 3108 |
| Description: |
Front Shot |
| Photo Date: |
1/28/2021 Upload Date: 8/14/2021 5:22:07 PM |
| Location: |
Kankakee, IL |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3108(GP40R) |
| Views: |
93 Comments: 0 |
|
|
|
| Title: |
IC 3108 |
| Description: |
The crew has now started up both engines and is preparing to begin a fairly short day of work. |
| Photo Date: |
1/28/2021 Upload Date: 8/14/2021 5:27:12 PM |
| Location: |
Kankakee, IL |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3108(GP40R) |
| Views: |
98 Comments: 0 |
|
|
|
| Title: |
IC 3108 |
| Description: |
The crew pulls the train off the spur track and stops right on the Kankakee River bridge to allow the conductor to throw the switch back. |
| Photo Date: |
1/28/2021 Upload Date: 8/14/2021 5:29:54 PM |
| Location: |
Kankakee, IL |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3108(GP40R) |
| Views: |
86 Comments: 0 |
|
|
|
| Title: |
IC 3108 and IC 3115 |
| Description: |
The GP40R duo continues south across the Kankakee River toward Otto. |
| Photo Date: |
1/28/2021 Upload Date: 8/14/2021 5:31:43 PM |
| Location: |
Kankakee, IL |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3108(GP40R) IC 3115(GP40R) |
| Views: |
132 Comments: 0 |
|
|
|
| Title: |
IC 3108 |
| Description: |
Unfortunately I misjudged this shot and didnt get it by the tower here in Otto like I had hoped, so this was all I was able to pull out. |
| Photo Date: |
1/28/2021 Upload Date: 8/14/2021 5:33:49 PM |
| Location: |
Otto, IL |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3108(GP40R) |
| Views: |
507 Comments: 0 |
|
|
|
| Title: |
IC 3115 |
| Description: |
After the intermodal passed, I went down to the location where CN parks their power for the Kankakee Local. Sure enough, both IC units were parked there in idle. |
| Photo Date: |
1/28/2021 Upload Date: 8/13/2021 7:02:07 PM |
| Location: |
Kankakee, IL |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3115(GP40R) |
| Views: |
135 Comments: 0 |
|
|
|
| Title: |
IC 3115 |
| Description: |
Side Shot |
| Photo Date: |
1/28/2021 Upload Date: 8/14/2021 5:17:35 PM |
| Location: |
Kankakee, IL |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3115(GP40R) |
| Views: |
103 Comments: 0 |
|
|
|
| Title: |
AMTK 115 and IC 3115 |
| Description: |
The Northbound City of New Orleans passes the GP40R duo before coming to a stop at the Kankakee Amtrak Station. |
| Photo Date: |
1/28/2021 Upload Date: 8/14/2021 5:24:40 PM |
| Location: |
Kankakee, IL |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
AMTK 115(P42DC) IC 3115(GP40R) |
| Views: |
124 Comments: 0 |
|
|
|
| Title: |
IC 3115 |
| Description: |
After doing some work at Otto, I made the dash back to Kankakee to shoot the train passing the station from the Court Street overpass. |
| Photo Date: |
1/28/2021 Upload Date: 8/14/2021 6:55:37 PM |
| Location: |
Kankakee, IL |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3115(GP40R) |
| Views: |
486 Comments: 1 |
|
|
|
| Title: |
IC 3133 |
| Description: |
While sitting in Lydick on what was then a very dead Waterlevel route, we hear the CN local key up the CN dispatcher for permission to head south to work at Stillwell with leader IC 3133. Well, we hoped the unit was still a Deathstar, but that was not the case, as it was a regular CN makred with IC markings and in trail a GTW engine. Also took the picture just a bit too late, as you can see. But oh well, still a very interesting catch! |
| Photo Date: |
11/5/2016 Upload Date: 8/7/2017 10:17:22 AM |
| Location: |
Stillwell, IN |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3133(GP40R) |
| Views: |
561 Comments: 0 |
|
|
|
| Title: |
IC 3137 |
| Description: |
As soon as Amtrak left, CN R960, the Kankakee "Hop Job" asked for permission out of the stub track and clearance to the yard. With no other traffic nearby, they were given permission right out. I decided for a ground level shot of the depot here. Just a week ago, there were reports of a Grand Trunk Geep still in GTW blue on this job. Unfortunately, it appears that changed sometime between then and now, as today it was a pair of IC repaints. No worries though. A CN standard cab is a CN standard cab. |
| Photo Date: |
7/17/2025 Upload Date: 2/9/2026 11:04:31 PM |
| Location: |
Kankakee, IL |
| Author: |
Jacob Werling |
| Categories: |
|
| Locomotives: |
IC 3137(GP40R) |
| Views: |
20 Comments: 0 |
|
|
|